Swing Arm Garbage Trucks
Chengli Swing-Arm Detachable-Bin Garbage Truck
A Chengli swing-arm truck for moving compatible detachable municipal waste bins from fixed collection points. Its hydraulic arm, chains and support frame must be matched to the selected bin design. Chassis, capacity and lifting rating require a signed vehicle and bin drawing before route planning.
Product gallery
Technical specifications
| Bin interface | Detachable waste bin on a support frame; choose a ground or pit installation for the final bin drawing |
|---|---|
| Bin construction | No. 6 low-alloy channel steel with 3 mm and 4 mm plate; confirm on final bin drawing |
| Lifting mechanism | Swing arms and chains |
| Hydraulic control | Manual multi-way valve |
| Power take-off | Engine-to-PTO-to-gear-pump drive described in source; final chassis unverified |
| Hydraulic components | Oil tank, filter, gear pump, directional valve, throttle valve, cylinders and pipes; confirm on the final hydraulic drawing |
| Bin fit | Bin dimensions, arm spacing, chain points and lifting rating require a matched drawing |
This swing-arm layout is intended for a collection network that uses one truck with compatible stationary waste bins. Container fit, safe lifting mass and route clearance must be established from the final truck and bin drawings.
Core capabilities
Detachable-bin handling
Swing arms and chains
Lifts a compatible bin onto the support frame for transport.
Conditions: Bin lifting points, arm geometry and safe working load must match.
Hydraulic operation
PTO-driven gear pump and manual valve described
Controls the arm cylinders during bin loading and unloading.
Conditions: Final chassis, pump and control arrangement need a signed specification.
Applications and operating fit
Municipal collection points using compatible detachable bins on accessible routes.
Suitable conditions
- Fixed municipal bin points with a matched detachable container
- Routes with checked turning, overhead clearance and tipping space
Conditions requiring a different specification
- Unmatched bin lifting points or unknown loaded weight
- Hazardous or liquid waste without an approved container
- Sites without space for arm movement and bin placement
Chassis and configuration
Configuration choices
- Ground-positioned and pit-positioned bin designs are described; choose one bin drawing and matching arm geometry.
- Select the chassis and bin design, then confirm fuel, vehicle mass, speed and rated capacity in the signed specification.
Plan a project quotation
Information to provide
- Bin drawing, dimensions, lifting points and typical loaded mass
- Collection-site access and overhead clearance
- Waste stream, daily bin count and disposal route
- Destination, drive side and quantity
Checks before quotation
- Confirm one chassis and powertrain
- Obtain signed arm/bin compatibility and lifting rating
- Confirm axle loads, legal loaded mass and destination documentation